Top

Project elaboration

We support consultants and designers in the sanitation, mining, industrial and agricultural sectors, always being present throughout the corresponding process.

GET A QUOTE

Instalation

Our Operations Division has the necessary equipment and tools to carry out the installation of treatment plants, deep well pumps, constant pressure equipment, hydropneumatic equipment, submersible wastewater pumping equipment, electrical installations, control panels, valves and accessories for pumping systems.

GET A QUOTE

Maintenance

We have a team of trained professionals and technicians who will provide follow-up through periodic visits to control the operation of the equipment acquired, during and after the warranty period. It includes:
. Preventive maintenance: We do it to foresee failures based on design parameters and recommended working conditions.
. Corrective maintenance: It is carried out when the failures have occurred. We will coordinate the immediate repair.
. Training for personnel in preventive maintenance.

GET A QUOTE

TECFLUSAC RECOMMENDS:

A periodic inspection is cheaper compared to forced losses due to damage or failure of different parts of certain equipment and machines. Inspections should be done periodically, depending on the type of service.

GET A QUOTE